Loading...
Energia rinnovabile
Fotovoltaico

Photovoltaic plant at the Lido Partschins (BZ)

The Municipality of Partschins was searching for ways to operate the lido using renewable energy, as the existing solar absorber mats had to be replaced and the roof refurbished. EUT developed an energy concept in which electricity generated by a PV system is used via an air-to-water heat pump to heat the swimming pool. Since the lido is only open during the summer season, the heat pump operates with a very high efficiency. Surplus electricity can be used through AID (remote individual self-consumption) to cover partially the energy demand of other municipal buildings.

Client: Municipality of Partschins
Project duration: 2023-2025
Installed power: 117 kWp
Heating Capacity: 80 kWt

• feasibility study
• submission and implementation project
• works management
• safety coordination
Verwandte Projekte