Loading...
Mobilità e spazi urbani
Ingegneria civile
Edilizia civile ed industriale

Commercial and service building in Natz-Schabs

EUT was commissioned to develop and plan a modern commercial and service building with three production floors and two service floors, including the outdoor facilities. The excavation directly adjacent to existing commercial buildings was secured with nail walls up to 25 m high. The building was constructed using prefabricated elements with thermal walls in exposed concrete look and prefabricated ceiling elements with hollow cores.

Client: Zingerle Group AG
Project duration: 2021 - 2025
Building volume: 64,000 m³
Excavation: 90,000 m³

• Feasibility study
• Project development
• Submission project
• Implementation project and construction management, structural engineering, geotechnical engineering, geology
Verwandte Projekte